Past Projects

  • Air Products – Net Zero Hydrogen Facility
  • Installed 8,200 m of pipe and 3,400 m of duct bank and electrical systems to ±10 mm tolerance.
  • Achieved 1.32 overall performance factor with 90% budget utilization over $2m in savings compared to budget.
  • Dow Chemicals – High-Voltage Transformer Project – 50 kW Transformers
  • Scope for four transformer sites included:
  • Foundation excavation.
  • Piping excavation and placement.
  • Duct bank excavation and placement.
  • Ground grid excavation.
  • General site earthworks and grading.
  • Aggregate placement.
  • EPCOR 500-Year Flood Mitigation
  • Constructed earthen and pre-constructed flood berms and retaining walls designed to exceed 500-year storm potential, protecting the City of Edmonton’s main water transfer and holding station.
  • City of Edmonton 97th Street Rejuvenation
  • Demolished and reconstructed nine city blocks, including above-ground landscaping, underground utilities, road and path earthworks, and surfacing.
  • Blue Sky Liability Reduction Programs
  • Evaluated 300 candidate sites to develop an annual program based on expenditure and liability capture.
  • Included remediation, decommissioning, abandonment, and reclamation activities.
  • Program goal: Achieve $1.10 liability reduction per dollar spent; actual average: $1.22 reduction per dollar spent.
  • Whyte Avenue Deep Remediation
  • Executed in the heart of a busy urban area with high civilian exposure.
  • Involved 32 m deep excavation with pedestrian traffic within 3 m of the edge.
  • Installed 42 m deep secant walls.
  • Managed highly hazardous and explosive environment with site-specific solutions for airborne and explosive gases, plus significant lead and hydrocarbon contamination.
  • Lloydminster Pipeline Corridor Mass Excavation
  • Performed remediation within one of Alberta’s largest live pipeline transmission corridors.
  • Excavated and hauled away over 3,000,000 m³ of material.
  • Operating Mine – Tailings Pond Optimization and Stabilization
  • Restored non-compliant tailings pond to compliance using advanced 3D surveying and machine control.
  • Maintained active tailings operations during the project.
  • Employed hydraulic-powered water pressure dredging to enhance flow and remove settled material while keeping the pond operational.
  • Solar Projects
  • Piling installation and earthworks, including:
  • Structural piling installation.
  • Site earthworks.