- Air Products – Net Zero Hydrogen Facility
- Installed 8,200 m of pipe and 3,400 m of duct bank and electrical systems to ±10 mm tolerance.
- Achieved 1.32 overall performance factor with 90% budget utilization over $2m in savings compared to budget.
- Dow Chemicals – High-Voltage Transformer Project – 50 kW Transformers
- Scope for four transformer sites included:
- Foundation excavation.
- Piping excavation and placement.
- Duct bank excavation and placement.
- Ground grid excavation.
- General site earthworks and grading.
- Aggregate placement.
- EPCOR 500-Year Flood Mitigation
- Constructed earthen and pre-constructed flood berms and retaining walls designed to exceed 500-year storm potential, protecting the City of Edmonton’s main water transfer and holding station.
- City of Edmonton 97th Street Rejuvenation
- Demolished and reconstructed nine city blocks, including above-ground landscaping, underground utilities, road and path earthworks, and surfacing.
- Blue Sky Liability Reduction Programs
- Evaluated 300 candidate sites to develop an annual program based on expenditure and liability capture.
- Included remediation, decommissioning, abandonment, and reclamation activities.
- Program goal: Achieve $1.10 liability reduction per dollar spent; actual average: $1.22 reduction per dollar spent.
- Whyte Avenue Deep Remediation
- Executed in the heart of a busy urban area with high civilian exposure.
- Involved 32 m deep excavation with pedestrian traffic within 3 m of the edge.
- Installed 42 m deep secant walls.
- Managed highly hazardous and explosive environment with site-specific solutions for airborne and explosive gases, plus significant lead and hydrocarbon contamination.
- Lloydminster Pipeline Corridor Mass Excavation
- Performed remediation within one of Alberta’s largest live pipeline transmission corridors.
- Excavated and hauled away over 3,000,000 m³ of material.
- Operating Mine – Tailings Pond Optimization and Stabilization
- Restored non-compliant tailings pond to compliance using advanced 3D surveying and machine control.
- Maintained active tailings operations during the project.
- Employed hydraulic-powered water pressure dredging to enhance flow and remove settled material while keeping the pond operational.
- Solar Projects
- Piling installation and earthworks, including:
- Structural piling installation.
- Site earthworks.